Working With an Integrator: A Guide for Architects and Designers

The low-voltage systems in a luxury home reach into almost every drawing: lighting control, the network, audio and video, security and access control. When they are designed with the architecture, the drawings carry their locations, their wiring and their equipment rack before construction starts. This guide explains how ioty works with architects, interior designers and builders on that design, and what the project team can expect at each step.

How does ioty structure a project with the design team?

We work in two phases, each with its own document. Phase 1 is the design, under a Design Services Agreement. It covers discovery, system recommendations, performance criteria, AutoCAD construction documents, device schedules, riser diagrams, rack layouts, infrastructure requirements and a preliminary budget. Phase 2 is the installation, under a separate proposal: procurement, installation, programming, testing, commissioning, owner training, warranties, support, and a closeout with as-built drawings, configuration backups and credentials.

Our usual order is a budget first. For each system, the owner sees Good, Better and Best options, with an estimated figure for each. Final pricing follows the Phase 1 design. On some projects the design comes first and the budget follows.

What does the design phase include?

Each agreement is written for its project. A typical one sets out the scope in eight parts:

Low voltage and lighting control are separate disciplines in the agreement, so lighting control can be included or left out. When it is included, our design covers the keypads, the lighting groupings, the load tags and the panel wiring. If a lighting designer is already on the team, compare their scope with those four items before the agreement is drawn up, so that each item has one owner.

Keypads and dimmers on a display wall at CEDIA Expo 2026: motion, button, paddle and keypad dimmers, a fan speed control and a paddle switch

What does ioty need from the architect or designer to start?

Three things start the design work: the signed agreement, the payment and the project’s CAD files. The fee is paid in full at signing, with no separate deposit. We schedule the discovery meeting when the signed agreement and the payment are in. The design work starts when we also have the .dwg files.

The agreement has one client signature, and the signer does not have to be the owner. A builder or an architect can sign for the project. The signature block takes the signer’s name and title, and the agreement names the company when a company signs.

What happens after the documents are issued?

Changes to coordinate with the other trades before the documents are issued are part of the design. After they are issued, the agreement includes five hours of revisions. More revision time is billed at the hourly rate in the agreement, and the client approves it before the work starts.

The installation proposal is issued after the design documents. When ioty is awarded the installation contract and it is above the size set in the agreement, the full design fee is credited toward it.

When should the integrator join the project?

Before the electrical set is final. Our design agreements can start as early as design development. Our pre-wire guide explains the three visits on a new build: a design review during permitting, a rough-in visit after framing and the HVAC and plumbing rough, and a trim-out visit after drywall and paint.

Can I bring a client to see the systems?

Yes, and we encourage it. Our Doral showroom shows every capability we install, including a working cinema and whole-home audio. Our Design District showroom shows lighting control and shading. Both are by appointment, and we are glad to walk a client through either one with you.

Frequently asked questions

Does ioty charge for design work?

Yes. Design is a paid first phase under a Design Services Agreement, and installation is a separate second phase. ioty, a home technology integrator based in Doral, Miami, produces the coordinated low-voltage and lighting control documents and a preliminary budget in the first phase.

What documents does the design phase produce?

AutoCAD construction documents, device schedules, riser diagrams, rack layouts, infrastructure requirements and a preliminary budget, built on the system recommendations and performance criteria from discovery.

Who can sign the Design Services Agreement?

The owner, the builder or the architect. The agreement has one client signature block, with the signer’s name and title, and the company when a company signs.

When does the design work start?

When we have the payment, which is due in full at signing, and the project’s CAD files in .dwg format. We schedule the discovery meeting as soon as the signed agreement and the payment are in.

Is the design fee credited toward the installation?

When we are awarded the installation contract and it is above the size the agreement sets, the full design fee is credited toward it. The agreement states that figure for each project.

Are revisions included?

Changes to coordinate with the other trades before the documents are issued are included. After they are issued, five hours of revisions are included. More time is billed at the hourly rate in the agreement, and the client approves it before the work starts.

Have a plan set on your desk now? Tell us about the project through our contact page or call 305-507-7402, and we will set up a call to go through the drawings and the low-voltage scope with you.